Product Model: XB-GA(L)
The XB-GA(L) Type A high-intensity aviation obstruction light is primarily designed for tall structures over 150 meters in height, including high-rise buildings, power transmission towers, tall chimneys, and bridge towers, suitable for high-standard aviation warning illumination projects. The product features high-power LED light source with computer chip-controlled circuitry, built-in GPS wireless synchronization and light-sensing control. It supports automatic switching between three intensity modes — daytime, dusk/dawn, and nighttime — making it ideal for critical projects with demanding high-altitude obstruction warning requirements.
Product Features
- Suitable for tall buildings and structures over 150 m in height
- Built-in GPS wireless synchronization
- Three-mode automatic intensity switching: daytime, dusk/dawn, and nighttime
- High-power LED light source
- Built-in light-sensing control
- Designed for high-standard aviation warning projects
- Non-standard customization available
Applications
- Super high-rise buildings
- Tall chimneys
- Bridge towers
- Power transmission towers
- Communication towers
- Critical high-altitude warning projects
Technical Specifications
| Parameter | Details |
|---|---|
| Product Name | Type A High-Intensity Aviation Obstruction Light |
| Product Model | XB-GA(L) |
| Light Source | LED |
| Input Voltage | AC 220V ± 25%, DC 48V ± 10% |
| Average Power | ≤ 100W |
| Flash Rate | 40–60 flashes/min |
| Daytime Intensity | 200,000 cd ± 25% |
| Dusk/Dawn Intensity | 20,000 cd ± 25% |
| Nighttime Intensity | 2,000 cd ± 25% |
| Light Color | White |
| Beam Angle | 120° |
| Adjustable Elevation | 0° to 10° |
| Protection Rating | IP66 |
| Operating Temperature | -40°C to +55°C |
| Humidity Range | 0 to 95% |
| Wind Resistance | ≥ 80 m/s |
| Dimensions | 400 × 300 × 200 mm |
| Net Weight | 10 kg |
| Installation Method | Vertical outdoor mounting; wall-mounted with bracket also available |
| Customization | Available per project requirements |
| Warranty | 2 years |
| Lead Time | 5–15 days |
Installation This product is typically installed using vertical outdoor mounting. Wall-mounted installation with a bracket can also be provided based on on-site project requirements. Indoor installation can be customized upon request.
Customization Non-standard customization is supported. Installation methods, power supply options, and selected configurations can be adjusted based on project requirements.
Lead Time & After-Sales
- Lead Time: 5–15 days
- Warranty: 2 years
- After-Sales Service: Product selection assistance, installation guidance, and technical support
Contact Us For detailed specifications, selection guidance, or quotation proposals on the Type A high-intensity aviation obstruction light, please feel free to contact us.